M05 Kiev-Odessa Road Rehabilitation

High Speed Rail Project

Location: United Kingdom
Client: Align JV (Bouygues TP, VolkerFitzpatrick Ltd, Sir Robert McApline Ltd)
Date:
Services:

This is a UK government-backed scheme to construct a second-high speed railway project. The project involves the construction of 160 km of rail tracks, using twin-bored tunnels and green tunnels, viaducts and engineering earthworks to achieve a technically-viable and environmentally-sensitive solution.

Align, the UK high-speed rail bidding consortium of Bouygues Travaux Publics, Sir Robert McAlpine, and VolkerFitzpatrick appointment Jacobs Engineering Group Inc. and Ingérop-Rendel as its design partners.

High Speed Two (HS2) Phase 1 is the expansion of the high-speed rail network between London (Euston Station) and Birmingham, West Midlands. The project has been approved by Parliament and is currently awaiting Royal Assent in December 2016.

The track alignment between London and Birmingham comprises seven contracts. ALIGN JV prequalified for four of these contracts allowing them to submit a bid for Early Contractor Involvement (ECI) Stage 1 for each. ECI Stage 1 is due to be awarded and to commence in Spring 2017 and involves the development of the existing Employer’s Design to Concept Design Stage prior to Detailed Design and Construction (Stage 2).

Rendel and Ingérop provided exemplar tender designs for four contract to the Design-and-Build bidding contractor, ALIGN, a Bouygues TP-led JV that also consists of VolkerFitzpatrick and Sir Robert McAlpine. The services provided included: designs for viaducts and other bridges and structural elements; Geotechnical modeling and ground risk assessments for tunnels and earthworks; soil-structure interaction analysis for shafts, underground and other earth-retaining structures; Highway designs for road diversions, realignments, new junctions, new access roads, pavements, emergency hard standings, road drainage and vehicle swept path analysis; and Track alignments. Rendel produced composite 3-dimensional models of the designs to meet the ultimate client’s BIM and data management requirements.

Tender Design services relating to High Speed Two Phase One – Main Works Contracts S2, C1, C2 and C3.

The Technical Bid Question Section J001a for each Contract required a Stage 1 Scheme Design for the Exemplars based on the information provided in Volume 0, the Works Information.

The following describes the Exemplar Lots for each Contract:

S2 - Chainage 13+020
West Gate Vent Shaft; Headhouse and external works; Planning permission associated with Headhouse; Potential infrastructure protection works associated with Acton and Northolt NR operational railway, as well as the LU Central Line and River Brent.

C1 - Chainage 42+800 to 43+100
Little Missenden Vent Shaft and Auto Transformer Station; Shaft; Cross Passages; Headhouse and external works; Hard Standings; Accesses; Tunnel interface

C2 - Chainage 50+400 to 52+950
Wendover Dean South Embankment; Wendover Dean Viaduct; Wendover Dean North Embankment; Rocky Lane Cutting; Small Dean South Embankment; Wendover ATS; Rocky Lane Culvert; Rocky Lane Underbridge; Small Dean Viaduct

C3 - Chainage 107+530 to 109+830
Culworth and Edgcote cuttings; Edgcote North and South embankments; Edgcote viaduct; Osierbed Spinney culvert; Bridleway AG10 overbridge.