Padma Multipurpose Bridge Project

Location: Bangladesh
Client: Bangladesh Bridge Authority (BBA) / Ministry of Communication
Date: 2016 - 2019
Services: Management Support Consultancy (MSC) Services

Rendel - in association with BCL Associates Ltd (BCL) of Bangladesh, PADECO Co. Ltd, Japan and Katahira & Engineers International (KEI), Japan was appointed by the Bangladesh Bridge Authority (BBA) to provide Management Support Consultancy (MSC) Services on the US$ 2.9 billion Padma Multipurpose Bridge Project (PMBP).

Funded by the Government of Bangladesh, PDMP will be a two-level, steel truss bridge with a four-lane highway on the upper level and provisions for a single track railway on the lower level. The upper and lower levels will act compositely with a reinforced concrete deck slab. The bridge will have a total length of 6.15 kilometres and a width of 22 metres at upper deck level. As well as rail and road, the bridge will carry utilities including high pressure gas pipe and telecommunication lines.

It will be the largest bridge in the Ganges-Brahmaputra-Meghna river basin, located approximately 40 kilometres south west of Dhaka. It will connect the south-western region to the rest of Bangladesh to encourage and facilitate economic growth through the transport of people, goods, natural gas and telecommunications.

In addition to the construction of the bridge itself, there will be an elaborate system of associated road constructions including two toll plazas and bridge end facilities, a 13.6 kilometre, four-lane, dual carriageway approach road, culverts, small bridges, under passes, service roads and service areas for residential accommodation. Complex river bank protection/training works of 14 kilometres length will also be constructed. The social and environment impacts will be carefully managed via the implementation of a Resettlement Action Plan (RAP).

Rendel is providing project management of the entire scheme including contractual and commercial advice; engineering and technical support and advice; budgetary and financial management; quality control and assurance; advising on dispute settlement; and the implementation of the social Safeguard Plans (environment, resettlement). The company will also be responsible for BBA staff and designing a programme for the social-economic aspects of the project. Rendel’s contract is for approximately three and a half years, from March 2016 until December 2019.

Rendel also completed the original Padma River Crossing Pre-feasibility Study in 2000.

Map

Contact

Sam Khan
Director Bridges and Structures

london@rendel-ltd.com
Keith Taylor
Keith Taylor
Director Fee-Earning Assignments
Immersed Tube Tunnels
and Other Structures

london@rendel-ltd.com
Keith Taylor

Categories

Bridges